Contact Information
Aircraft Details
- Price: Call for Price
- Year: 2002
- Make/Model: Bombardier 60 XR Learjet
- Serial Number: 257
- Registration Number: N772EC
- Power: Turbo Fans
- Engines: 2 Engines
- Flight Time: 9971
- Listing ID: 3663817
- Partner ID: 194207
- Posted On: Sep 8, 2023
- Updated On: Sep 23, 2023
Description
Tel: (754) 234-9993 1100 Lee Wagener BlvdSuite 211Fort Lauderdale, FL 33315All Specifications Subject to Verification Upon Inspection Availability Subject to Prior Lease, Sale, or Withdrawal From Market Without Notice
Airframe Landings: 6,881
Engines Engine Program: On ESP GOLD
Loc.
Make
Model
TSN
CSN
L
Pratt & Whitney
PW306A
4572
3282
R
4947
3322
Avionics
Collins Pro Line 4 EFIS / Avionics System Includes: Dual Collins ADC-850D Air Data Computers Dual Collins AHC-85E Altitude Headline Computers Dual Universal UNIS-1C FMS w/Dual GPS Dual Collins FCC-850A Flight Control Computers Dual Collins VIR-432 NAV Units Dual Collins VHF-422A COMM Units Dual Honeywell 800 Digital Acquisition Units Four tube Collins EFD/MFD-871 with 7 x 8 Displays Dual TDR-94D Mode S Transponders Collins TTR920 TCAS w/Change 7.1 Collins WXR-840/RTA-844 Color Weather Radar System Collins ALT-55B Radio Altimeter
Interior
New interior in August 2014 by Bombardier, Fort Lauderdale. Fireblocked 8-Passenger configuration including four executive club seats in the rear, two-seat divan facing a single executive seat in the front, in addition to the belted lavatory. Forward galley. External baggage compartment. Headliner and sidewalls are Monaco and Volaero Munich leather from Aeristo. Carpet is Costa Rica tweed from AIP, and woodwork is high gloss striped Sapeje. Ft. Lauderdale/Miami based.
Exterior
New Paint in 2012 by Bombardier FLL (Only flown 400 hours since). New stripes in May 2017.
Maintenance
Hangared: Yes
12-Month Inspection c/w March 2018 Next Due March 2019
24-Month Inspection c/w March 2017 Next Due March 2019
48-Month Inspection c/w March 2017 Next Due March 2021
96-Month Inspection c/w March 2013 Next Due March 2021
144-Month Inspection c/w September 2014 Next Due September 2026
6000-Cycles Gear Inspection Due in 90 Cycles
New Windshield Installed in March 2017
On Part 135 Certificate
Excellent History and Records
Ft. Lauderdale/Miami Based
Click here for
Due List Report
Click here for
N772EC MX